Installation Process and Matters Needing Attention of Concrete Mixing Plant Equipment
In order to ensure the installation progress and reduce the installation workload, the crane and loader are used at the same time to improve the efficiency. Check whether the foundation meets the concrete batching plant installation requirements, and if so, install it. The installation sequence of concrete mixing station is as follows: I. The Main Frame Installation (1) Connect the mixing layer girder with bolts and connecting plates, lift the mixing layer girder with 8t crane, and then rotate it by 180 degrees so that the lower plane of the mixing layer girder faces upwards. Lift the lower legs with 8t crane, connect them with the mixing layer girder by bolts, connect the mixing layer girder with four columns on the ground, hoist the hopper under the mixing layer girder and connect them with bolts, then rotate 180 to make the columns face down, hoist them on the foundation with a big crane, and fix them with footbolts. (2) Hoist the main mixer on the girder and connect it with bolts. (3) Hoisting the weighing layer, connecting the weighing layer...